Wales

First view - the garage roof was peeling, cracked, fragmented and rotting

This enviably large 46m2 garage roof in Borth on the West Wales coast (SY24, Ceredigion) had been so neglected that nothing was salvageable (which is rare). In this case, it meant a complete rebuild. The entire job cost less than 10K.

What was done:

After stripping the roof of all the old material, 32 joists were installed. This created the structure to redeck the roof A polyroof 20 year Protec liquid system was installed New upvc…
The basic frame for the canopy, stripped bare

This porch canopy in Kidwelly (SA16 / SA17) was in desperate need of replacement as a result of continual lead theft.

Leadwork on higher roofs is frequently stolen but the easier, lower reach of this canopy had made it especially attractive to thieves.

For a small area, this required an unusual amount of work as the entire canopy needed to be constructed from scratch. The forming and construction work of this 13ft wild canopy…

The Rhondda Heritage Park Underground Experience Centre is a maze of walkways, nook and crannies
Rhondda Heritage Centre:

Rhondda Heritage Centre is a tourist attraction in Trehafod, Rhondda Cynon Taf (CF37) that lets visitors see into the lives of the coal mining community in the area from the 1790s until the 1980s. Tours through the Lewis Merthyr colliery mineshaft are led by former colliery workers. Rhondda Heritage Park itself exists on the site of the former Lewis Methyr Colliery and is an Anchor Point of ERIH, The European Route of…

The finished system - perfect forming around every roof detail

The Glengower is a traditional sea-front pub and restaurant in the popular West Wales town of Aberystwyth. Its roof was suffering standing water (a major cause of water ingress, mould growth and eventual roof instability).

We removed the standing water by increasing the sump sizes, lowering the outlets and removing the duct work while new waterproofing was applied. After that, the duct work was quickly refitted. The process and our…

The metal clad exterior was coated over its entire surface

These portacabin-style dance studios at Aberystwyth University (SY23) were in need of refurbishment involving coating the metal cladding to waterproof it and prolong its life.

We used the Polycoat RoofTec Elite system over the entire exterior - demonstrating the incredible versatility of the polymer system and the range of uses in which it excels.

WHERE NOW?

Browse our new build section, including green roofing,…

Finished terrace with 10 yr quartz system and 20 yr waterproofing

This cold roof terrace in Aberystwyth, West Wals (SY23) supplies upgraded ventilation and new decking for the owners. The whole balcony is jointless and seamless, meaning water drains away readily and the terrace takes advantage of both a Polyroof 20 year waterproofing system and a 10 year quartz system.

WHAT NEXT?

Browse some of our other terrace and balcony projects around the UK> Browse our balcony and terrace section>…