North Wales

Fall Correction to Terrace in Caernarfon

This roof terrace / balcony area in Caernarfon (Gwynedd, North Wales) had a drainage issue, with water not running off as it should due to a faulty fall. Our job here was to correct the fall and create a roof with proper run-off.

20 Year Polymer Flat Roof Refurbishment for Bala Spar

This Spar shop in Bala in Gwynedd in North Wales needed an economical reinstatement for the roof for a new commercial lease, which we were able to provide using the polymer system. The overlaid 20 year liquid membrane system provides a durable, high spec and affordable refurbishment and is supported by a 20 year insurance-backed guarantee.

As with all our polymer roofs, this shop roof was completely mechanically cured within 72 hrs, waterproof, weatherproof and safe to walk in within just a few hours.

Find out more:

Flint Balcony Refurbishment and Waterproofing, North Wales

This rubber clad plywood on this balcony flat roof in Flint, North Wales had failed, deteriorating in several places. This was the third time the roof had had to be replaced in the space of 12 years and the owner was now seeking alternatives. As the pictures show, the flat roof was over a hollow storage area which adjoined the house. A new substrate was required along with a waterproof covering.

Balcony in Mold, North Wales

This new build in Mold, Flintshire in North Wales needed a balcony surfacing system that would allow building work to continue without long disruption and delay. It was also essential that this area was fully waterproof and watertight quickly in order to keep the underlying fabric dry.

The polymer membrane system was the ideal choice, ensuring the entire balcony area was waterproofed and weatherproofed quickly, and safe to walk on within 6 hours so that work could continue uninterrupted!

Cottage roof terrace in Oswestry, Shropshire

This bedroom roof terrace at a Shropshire cottage in Oswestry, on the border between England and North-East Wales, was leaking significantly.

The existing slabs and leaking felt underlying these were removed to give a fresh base. We then installed a tray to span the cavity, before applying a full 15-year system to join the tray seamlessly to the roof.

Work on the roof terrace was completed in just 3 days, leaving the owners delighted.