Westcountry

Metal mobile portable telecoms unit

This metal mobile portable telecoms unit in North Devon required improvements to the roof.

The gutters, which were small, kept blocking. As this causes a range of serious problems, the gutters were removed. New drip trim and deep flow alloy gutters were fitted, creating a roof that will now channel water properly.

Following this, the entire roof was then encapsulated in poly roof Protec fiberglass, completing the roof.

Despite the gradient, the bin roof looks level

The owners of this new bin storage area in Cheltenham, Gloucestershire were looking for a long-lasting, aesthetically pleasing solution to keep outdoor bins dry and well-protected from the weather.

As the photographs show, the polymer system is just as versatile and effective for smaller projects as for larger ones. We were able to construct a cleanly-draining roof area, tapered to inbuilt guttering so the water never pools - meaning…

This large, new build roof needed insulating, installing and weatherproofing

The owners of this large new build on Parabola Road in central Cheltenham had very specific requirements, needing a warm roof over a truly huge, flat area.

We're highly experienced in installing warm roofs and flat roofs over more or less any size space, as many of our commercial projects, in particular, show.

The entire roof achieves an excellent u-Value of 0.12 and the system is a 20+ year system, meaning it will retain that…

Completed roof

This new electricity substation in Hereford, built to improve power supply to the city's homes, was being built from scratch and needed a good, high-spec, fully weatherproof and long-lasting roof from the outset.

We used a guaranteed 20 year protection system, installation as shown in the pictures above.

The polymer system we used - Protec - is also ideal for reinstating existing power substations with zero fall, since Protec is…

Topcoat drying - this will provide the base for the composite decking

This seafront property in the Cornish town of Falmouth (TR11) required an overlay system for the installation of new composite decking along the entire terrace length. With its location, one of the key specifications for any installation is a very high degree of waterproofing and weather resistance / weatherproofing, which meant the polymer system was ideal.

In addition, the owners also needed a pool house vapour layered ready for the…

Prior to refurbishment, the roof  was lumpy, splitting and retaining damp

This portable cabin style warehouse office block on a small industrial estate at Berkeley Heath between Bristol and Gloucester (GL13 9EU) needed its roof refurbished.

As usual, we began by meticulously going over the existing roof, clearing debris, pressure-cleaning, making repairs, and so on. Only then do we apply base coat, fully sealing the area. We then applied a high-spec, jointless, seamless top coat that makes water ingress…